Project Update:

EF Johnson’s (EFJ) team has completed the site walk and data collection work. They have prepared a package for each site consisting of a: Technical site walk document / Site photos / Schematic site plan showing the proposed tower and communications shelter / Statement of work for improving the site.

We are in the process of reviewing these documents and clarifying the information where needed. Once we have approved the documents, EFJ will prepare a budget for the cost to improve the sites. A couple of discoveries:

  1. The Ridge Road site in South County does not have adequate space to accommodate the facilities. Rueben suggested that Pacific City Joint Water Sanitary Authority has constructed a new water tank that might be a good site. The EFJ team has reviewed and concurs that it would be a good replacement for Ridge Road. Pacific City is willing to allow us to collocate.
  2. Four of the EFJ proposed sites are owned by American Tower Corporation (ATC), a nation-wide communication site/tower firm. The good news is these sites have towers that will accommodate our height and loading needs and are in place. A bonus is that each of the sites has a Sprint/Nextel building that has been abandoned which would accommodate our needs. ATC is willing to donate the building to us. We would need to refurbish the building, furnish and install a generator and propane tank, and install our equipment. The bad news is ATC’s proposed rental rate for the site use is very high. EFJ is looking for alternative sites so that we can review an option.
  3. In reviewing the site list, we noticed that the tower at the Sheriff’s office was not on the EFJ did perform a site walk and data collection so that will be added. This makes our total site count 18 sites.

Federal Engineering, County Counsel’s Office, and I have reviewed and commented on EFJ’s proposed Contract documents for the project. These have been forwarded to EFJ for their review.

I anticipate that we should be through the site review and pricing efforts by April. Once we have determined the sites we will need to lease or purchase, the ones not already owned or leased by the County. My current plan is we will have a contract in place with EFJ by May.

Please let me know if you have any questions.

John Hartsock, Project Manager